Reducing cost and emissions for a mine operation using a virtual pipeline solution
Customer
Labyrinth ResourcesLocation
Ontario/Quebec, CanadaSector
MiningExecutive summary
Between the remote region, temperatures as low as -30°C, and the rising cost of diesel, channeling temporary power to this exploratory mining project was challenging for Labyrinth Resources. Aggreko's natural gas power plant overcame every obstacle to deliver clean, reliable, cost-effective power.

The challenge
Remote gold mine location
No grid power available
Lower cost power source
-30°C temperatures

The solution
CNG via virtual
pipeline solution
A CNG (compressed natural gas) power plant facilitated by regular delivery of CNG via 48-foot containers trucked to the mine site.


Key facts
Virtual
Pipeline solution
2 x 300 kW
Natural gas generators
60 kW
Diesel generator
$60,000
Fuel costs saved per month
The impact
Gas power delivered immediate savings
Money invested in the mining exploration
Reduction in emissions met local regulations